Release 2 and later

On the board.

Hydrographs and Pipe Networks layout are in Release 1. The full Run is still in process, with Water Quality, Cost, and Grading.

Coming soon

Network HGL / EGL Run

Release 1 already imports the Civil 3D network and assigns inlets. This later piece is the compute: HGL, EGL, Results, and profile.

  • Structure types that match Civil 3D: grate, curb, combination, outfall, manhole.
  • Results: rim, invert, size, Q, HGL, EGL, velocity, warnings when the crown or rim is wet.
  • Inlet capture and bypass. Write sizes back to CAD is later than the first network Run.
Wet street with manholes and inlets
Coming soon

Hydrograph routing

Release 1 already has the node diagram. This later piece is the compute: SCS Type II Run, pond storage and outlets, StormTech.

  • Run storms. Pond inspect: Q vs time, elevation, rating table.
  • StormTech chamber layout.
  • Export a HydroCAD .hcp of the model you built.
Detention pond with an outlet structure
Coming soon

Water Quality

NCDEQ MDC and SCM. Simple Method WQV from POST drainage areas. Treatment train you can edit.

  • Statewide Rd 1.0 in. SA 1.5 in.
  • SCM catalog from Design Manual Part C.
  • Built for North Carolina site work first.
Bioretention rain garden
Coming soon

Cost Estimating

A takeoff from the pipes, structures, lining, and storage you already designed. Not a separate spreadsheet if we can help it.

  • Quantities from the live design.
  • Unit prices you set.
  • A sheet that can go in the calculation book later.
Calculation sheets on a desk
Coming soon

Grading Tools

Surface view from the Civil 3D TIN. Orbit, pan, zoom. Aids that help you see how water wants to move before you lock the grade.

  • 3D colored TIN from the open drawing.
  • Build DAs from that surface inside the property fence is the long goal.
  • This is later than hydrographs and pipe networks.
Earthwork site at dusk
Setup Project from Linework is also Coming Soon. It is not a Release 1 tab.